Sahaya for Manufacturing

Your real cost per unit,
finally visible.

BOMs, batches, raw-material watch, job-work paper — the factory’s numbers, as live as the factory floor.

A real day at Precision Works
SahayaPrecision Works

On plan.

Batch 88 finished costing at ₹212/unit, 3% under plan. Raw material for next week is covered. Nothing needs you today.

₹212
per unit, batch 88, under plan
6 days
of raw material on hand
29
things done today
Review: scrap rate on line 2 crept to 4.1%
Resin PO ready — 6 days of stock left
press J K to move · A to approve — this is the real product

The work it takes off your desk

Costing by guesswork

Every batch posts its true cost — materials at actual purchase price, labour, overheads by cost centre. You learn your real margin per unit, per batch, not per year.

Raw material runouts

Sahaya watches consumption against production plans and drafts POs before the line would stop. Six days of resin left reads as a queue item, not a crisis.

Job-work paper trails

Challans out, challans back, wastage reconciled, GST ITC-04 prepared — the subcontracting paper that used to take a clerk’s week, handled.

A day, end to end

07:00Batch 88 closes: ₹212/unit, 3% under plan. Posted to the books with full cost breakup.
12:00Resin consumption says six days left. PO drafted at last quarter’s negotiated rate.
18:00Line 2 scrap rate crept to 4.1% — flagged with the shift-wise pattern attached.

Your whole team, included.